SMART ROAD · ROAD TECHNOLOGY

Smarter roads.
Safer journeys.

We connect cameras, sensors, weighing, traffic lights and road signs in one system. It helps teams see what is happening and act faster.

Analysis · engineering · supply · integration · service

WEIGH-IN-MOTION / LANE 02

Vehicle measurement event

LIVE

SENSOR ARRAY / ONLINE

06.09.2026 15:42:18

GROSS WEIGHT

36 420 kg

SPEED

78 km/h

VEHICLE CLASS

N3 · 5 axles

LICENSE PLATE

01 785 LAA UZ

ENFORCEMENT STATUSVEHICLE OK

SMART ROAD in simple terms

The system sees, understands and helps teams act

Road devices collect data, software explains what is happening, and the operator gets a clear picture and a practical next step.

01

Sees

Cameras and sensors detect vehicles, weather and events.

02

Understands

Software combines the data and explains what is happening.

03

Helps teams act

Operators get an alert and can manage traffic.

SMART ROAD ECOSYSTEM

Every field device in one control environment

Select a system element to see its role in the architecture.

SMART ROAD

CONTROL CENTER

Gross weight, axle loads, class and speed.

CONNECTED / WIM

Data flow

From a road event to an operational decision

Every stage is engineered as part of one measurement and information flow.

01

Detection

02

Identification

03

Measurement

04

Recognition

05

Decision

06

Server

07

Control Center

Technical catalog

Choose the right equipment

Find the device type, compare the main parameters and open its documents. We confirm the exact configuration after reviewing the site.

WIM

SR WIM HS-4

High-speed weighing and traffic data collection.

SPEED
до 200 km/h
LANES
до 4
INTERFACES
Ethernet, REST API, VPN
HS-WIMEnforcementAPI
WIM

SR Bridge WIM B-2

Bridge load and traffic flow monitoring.

SPEED
транспортный поток
LANES
до 2
INTERFACES
Fiber, TCP/IP, REST API
Bridge WIMSHMAnalytics
ANPR

SR Vision ANPR-X

Plate recognition for multi-lane sites.

SPEED
до 250 km/h
LANES
до 4
INTERFACES
ONVIF, RTSP, REST API
ANPRDay / nightONVIF
Traffic Radar

SR Traffic Radar T-8

Counting, classification, speed and lane occupancy.

SPEED
до 250 km/h
LANES
до 8
INTERFACES
Ethernet, MQTT, TCP/IP
8 lanesQueueMQTT
RWIS

SR RWIS Meteo-R

Road weather and surface-condition station.

SPEED
не применимо
LANES
точки измерения
INTERFACES
RS-485, Modbus, MQTT
SurfaceVisibilityModbus
VMS

SR VMS ProLine

Variable road messages and speed-limit control.

SPEED
не применимо
LANES
портал / полоса
INTERFACES
Ethernet, NTCIP, REST API
VMSLane controlRemote

Project delivery

How a project moves forward

We study the road and the objective, engineer the system, install it and support it after launch.

01

Site analysis

02

Engineering

03

Supply

04

Installation

05

Integration

06

Commissioning

07

Training

08

Service

PROJECT AREA

Highways

WIM · ANPR · Traffic Monitoring

We tailor the system to the road and the objective.

PROJECT AREA

Urban mobility

ATMS · Smart Intersections · VMS

We tailor the system to the road and the objective.

PROJECT AREA

Critical infrastructure

Bridges · Tunnels · Borders

We tailor the system to the road and the objective.

Tender Center

Send the assignment — we will review it step by step

Requirements analysis, compliance matrix, BOQ, equipment selection and technical proposal preparation.

  • Requirements analysis
  • Compliance matrix
  • Technical comparison
  • BOQ / Bill of Quantities
  • Datasheet & certificate package
  • Commercial proposal

Service & support

Support after commissioning

Installation, commissioning, calibration, preventive maintenance, repair, training and remote support.

Road specialists carrying out service work

On-site and post-launch support

Installation
Commissioning
Calibration
Preventive maintenance
Repair
Remote support
Spare parts
Training

Service request

SR-SVC-2026-XXXX

Knowledge Center

Answers to common questions

Core ITS concepts, standards and equipment-selection principles in a clear format.

Weigh-In-Motion measures gross and axle loads while a vehicle is moving. It supports data collection, preselection, tolling and enforcement; the use case determines accuracy and architecture.

Start a project

Describe the task in your own words

Describe the site in your own words or attach an existing assignment. You will receive a request number after submission.

Files are validated before processing

Request delivery is monitored

A unique request number is issued